Pipeline Installation Case Studies
Case Study 1
BHP Ravensthorpe Nickel Process Plant
50mm to 1000mm Bondstrand GRE Piping
(click images to enlarge)
|
Case Study 2
Centron GRE Fibreglass Pipeline
Media release in relation to the 3.5km pipeline connecting the Eremia 1 and Eremia 2 oil wells to the Hovea production facility in Western Australia's Mid West region.
|
|
Case Study 3
SANTOS JALBU 2003 CAMPAIGN (750kb PDF)
20 Centron Buried GRE flowlines.
39 Days on site On Schedule, On Budget, No Accidents and No Injuries.
|
|
Case Study 4
CHEVRON TEXACO
Barrow Island 60 Kilometre pro Active flowline Re-mediation.
35 Centron Flowlines Supplied and Installed by Adtech.
|
|
|
|