HomeAbout UsContact Us
Case Studies Surface Pipe Down Hole 1.5-10 Inch Down Hole 10-30 Inch Raci HDPE Spacers
 

Pipeline Installation Case Studies


Case Study 1

Location : Moranbah QLD
Service : Coal Seam Methane
Product : Ameron Bondstrand 16” ISO 14692 / AS2885 / ANSI #150

The largest diameter GRE gas pipeline designed and installed in
Australia to date (2010).

Centron GRE Fibreglass Pipeline

Case Study 2

Location : Narrabri NSW
Service : Coal Seam Methane
Product : Centron® GRE API 15HR Design 500psi
             10” (250mm)

Eastern Star Gas - Bibblewindi Flowline 32,500m
 

Case Study 3

Cooper Basin South Australia Callawonga to Tantanna 45 kilometer
5” Centron® GRE Parrafin Resistant Crude Oil Pipeline.

 

Case Study 4

BHP Ravensthorpe Nickel Process Plant

50mm to 1000mm Bondstrand GRE Piping

(click images to enlarge)


Case Study 5

20 Centron Buried GRE flowlines.
39 Days on site On Schedule, On Budget, No Accidents and No Injuries.


Case Study 6

Barrow Island 60 Kilometre pro Active flowline Re-mediation.
35 Centron Flowlines Supplied and Installed by Adtech.


Case Study 7

Media release in relation to the 3.5km pipeline connecting the Eremia 1 and Eremia 2 oil wells to the Hovea production facility in Western Australia's Mid West region.

Centron GRE Fibreglass Pipeline

Latest News

Adtech FRP are pleased to annouce that we now have a new pipeyard located in Jondrayan, Queensland. For more details, phone us on (08) 9262 7000.






ADTECH FRP has
ISO 9001:2000

accreditation for the Supply of Pipes and Structures, Project Management/ Installation & Associated Civil work


Contact Us
Tel : +61 (0) 8 9262 7000
Fax : +61 (0) 8 9249 3966
Email: sales@adtechfrp.com