Adtech FRP has ISO 9001:2000 accreditation for the Supply of Pipes and Structures, Project Management/Installation and Associated Civil work.
|
We supply:
|
| · |
Fibreglass reinforced epoxy pipes, ranging in size from 38mm to 1200mm, for high pressure, corrosion-resistant service for applications from pipelines, bore casing and rising mains, to slurry service and high pressure oil and gas service.
|
| · |
Fibreglass reinforced epoxy ball and butterfly valves, ranging in size from 25mm to 200mm, for a wide of variety applications from industrial pipelines, to fire water and oil and gas service.
|
|
|
|
Advantages gained from using Fibreglass Reinforced Plastics include:
|
| · |
Corrosion resistance to internal and external environments, pH range 1.5 - 12;
|
| · |
No maintenance costs from cathodic protection, chemicals, injection equipment, or corrosion monitoring infrastructure.
|
| · |
Cost savings in capital expenditure and installation
|
| · |
Excellent strength to weight ratios - 25% of the weight of an equivalent product in steel.
|
| · |
Pressure capabilities to 24 MPa in smaller pipes
|
| · |
Temperature range capability to 100oC for standard product. Higher temperature product available for specific applications.
|
| · |
Light weight, reducing the need for lifting equipment
|
| · |
Only small installation teams necessary
|
|
|
|
ADTECH FRP has installed and/or supplied Ameron Centron®/Bondstrand® GRE pipe/tubing/casing/ well screen to clients such as:
|
| · |
ChevronTexaco on Barrow Island, Western Australia, for 3 phase oil and gas flow lines, produced water gathering systems and re-injection wells totalling over 200,000m
|
| · |
Santos at Moomba for oil flowlines
|
| · |
Thevenard Island for 10,300 kPa gas flow lines
|
| · |
Western Power Muja Power Station, WA, using ceramic-lined GRE pipe for fly ash slurry disposal and 99oC brine service
|
| · |
Conoco, Queensland, for methane gas flow lines
|
| · |
Olympic Dam, South Australia, for rising mains - 200mm pipe at 8600kPa operating pressure, water droppers and observation bores.
|
| · |
Papua New Guinea for geothermal dewatering service at up to 120 degrees Celsius.
|
| · |
Barwon Water Supply, Victoria, for refurbishment of large water bore casing.
|
| · |
Water and Rivers Commission WA for Carnarvon Artesian Basin Refurbishment.
|
| · |
Water Corporation WA for artesian bore casing for Perth water supply.
|
| · |
BHP Biliton for coal mine dewatering
|
|
|
|
ADTECH FRP has developed and patented the Adtech Installer for the installation of Centron® GRE pipe. The higher productivity rates, achievable under the harshest working conditions, result in a shorter installation time and a lower costs for the client.
|